User name Fatiha
Log entry time 16:02:34 on March25,2005
Entry number 142401
keyword=Shift Summary
Shift Crew: F. Benmokhtar, P. Ulmer, X. Jiang
----------
8:30-11:00: Beam studies.
11:15: Beam back, did a Harp Scan (H. S. run 2111, coda run 2927)
12:10: MCC called, they want to open the slit for the compton,
it will take them 5min. After the 5min, they did other beam
studies for 15 min.
3:05 pm, cavity problem, beam down.
3:33 pm, Beam back, 40 uA.
List of runs:
------------
2926...Carbon... 186 K
2927...BeO...... Harp scan, run 2111
2928...Junk
2929...Carbon... 200 K ps1=50, Ramesh changed it
2930...Carbon... 200 K ps1=100
2931...Carbon... 200 K
2932...Carbon... 195 K Stopped, Beam down, cavity problem.
2933...Carbon... Goes to the next shift...