Main INDEX
Monthly INDEX
PREV
NEXT
User name Nilanga
Log entry time 00:03:35 on March29,2005
Entry number 142658
keyword=Shift Summary
16.45: Beam is back, but poor quality: position is off and many trips.
17.45: Beam acceptable, resume production data.
22:45: start a new Compton run (needed to reset)
23:45: noticed SRC lecroy HV is blank, NA rates are fine. Will reset after the current run is finished (#3023).
continue production data through the shift.