Hall A Experiment #: e01015
03/30/05 0800-1600
Shift Leader: J. LeRose
Shift Workers: E. Kuchina, R. Subedi
0800 | 0900 | 1000 | 1100 | 1200 | 1300 | 1400 | 1500 | Total Time | |
---|---|---|---|---|---|---|---|---|---|
Acceptable Beam in Use | 0.86 | 0.01 | 0.42 | 0.00 | 0.50 | 0.75 | 0.33 | 0.90 | 3.77 |
Beam Available but Not in Use | 0.01 | 0.00 | 0.28 | 0.12 | 0.00 | 0.00 | 0.52 | 0.02 | 0.94 |
Beam Not Available or Unacceptable | 0.13 | 0.99 | 0.30 | 0.88 | 0.50 | 0.24 | 0.15 | 0.08 | 3.29 |
Accelerator Con- figuration Change | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 |
Experiment Ready | 1.00 | 1.00 | 0.58 | 0.00 | 0.00 | 0.00 | 0.58 | 1.00 | 4.17 |
Planned Config- uration Change | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 |
Unplanned Experiment Down | 0.00 | 0.00 | 0.42 | 1.00 | 1.00 | 1.00 | 0.42 | 0.00 | 3.83 |
Hall not ready reasons | |||||||||
Target | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 |
Data Acq | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 |
Other | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.42 | 0.00 | 0.42 |
HRSL | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 |
HRSR | 0.00 | 0.00 | 0.42 | 1.00 | 1.00 | 1.00 | 0.00 | 0.00 | 3.42 |
HALL_OFF | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 |
Comments: Riad Suleiman uses beam from 12:00-14:00 for Lumi studies while Right dipole ramps up. The Hall was down but acceptable beam was being used.
Data Entry by: J. LeRose