• Main INDEX
  • Monthly INDEX
  • PREV
  • NEXT

    User name X. Zheng

    Log entry time 00:04:46 on March31,2005

    Entry number 142837

    keyword=shift summary


    18:30 MCC cannot deliver 50uA beam because of vacuum problem, lower beam current to 45uA;
    21:26 Left Q1 tripped, helium level fluctuating. We made an access to reset the power supply;
    22:24 Back to production;

    run summary
    run#   start  stop   #events comments
    3076   15:54  16:40  220K
    3077   16:40  17:29  250K
    3078   17:29  18:17  250K
    3079   18:17  18:30  15K  stopped due to beam vacuum trip
    3080   18:43  19:34  251K
    3081   19:34  20:16  200K
    3082   20:16  21:08  250K
    3083   21:08  21:25  65K  stopped due to Left Q1 trip
    3084   22:24  23:29  250K  NA Plane1 L-PMT TDCs 26
    3085   23:29    NA Plane1 L-PMT TDCs 26