17:20 Polarity on Left dipole and septum changed to positive
Arun took a look at the BCM equipment and found the temperature control for the unser box had tripped. The temp takes ~24 hours to stabilize so the BCM calibration scheduled for Wed morning (may) get pushed back.
18:00 Sieves out on both arms
18:40 Hall A going to beam permit
22:10 Test beam to Hall A
22:50 Septum steering test begun
23:55 Septum steering test completed: slight movement observed on beam dump viewer, but no steering adjustments were made to keep it 'on screen'