Main INDEX
Monthly INDEX
PREV
NEXT
User name E.Chudakov
Log entry time 23:49:49 on June10,2005
Entry number 145802
keyword=Shower/Preshower calibrated
The shower/preshower detectors have been calibrated and the database
entries in 20050510 db_R.sh.dat/db_R.ps.dat have been updated.
The old files are kept with a suffix ".old". A plot of
R.ps_asum_c vs R.sh.asum_c for run 4476 is attached.
Another plot contains the ADC-ped values from the central column of the
shower detector, for selected electron events hitting the displayed
module.
FIGURE 1
FIGURE 2