• Main INDEX
  • Monthly INDEX
  • PREV
  • NEXT

    User name R. Feuerbach

    Log entry time 20:09:28 on June 14, 2005

    Entry number 146136

    keyword=Plan for tonight

    Before we shut off, I want to do a quick study of the thickness of the waterfall target, using just T1 rates, as we change the pump speed.

    Using the parity DAQ and the spectrometer DAQ, take quick runs at 50 microamps at tach settings of 750, 600, 500, 400, and 300.

    Record the T1 rates for each setting, and note the Tach setting each in CODA run. Each run should only be 5 minutes.

    I'll make an official post cancelling tonights shift after talking with Kees or Javier.

    A copy of this log entry has been emailed to: voutier@jlab.org, vasulk@jlab.org