Main INDEX
Monthly INDEX
PREV
NEXT
User name jpchen
Log entry time 00:09:37 on June17,2005
Entry number 146252
keyword=Swing shift summary
6/16/05 Swing shift
J. P. Chen, S. Zhou, R. deLeo,
16:00 Techs working on the magnets in the hall.
19:30 Techs come out of hall. Requested to switch from restricted to beam permit.
20:55 completed sweep.
21:20 Beam permit.
21:45 pulsed beam.
22:15 CW beam, still tuning. Started to take RICH ped run and production run.
23:10 Beam was not good, MCC need to do optics and tuning, ~30 minutes.
run 4610, 22:15-22:23 RICHPED run, 5K, beam still tuning
run 4611, 22:26-23:57, 325K, production on waterfall, beam still
tuning.
run 4612, 23:58- , richped RUN while beam tuning.