Main INDEX
Monthly INDEX
PREV
NEXT
User name E. Cisbani
Log entry time 05:03:30 on June24,2005
Entry number 147061
keyword=Right Septum Magnet Tripped
Right Septum Magnet trips around 4:2 due to over temperature.
Asked MCC to turn off beam to speed up magnet cooling down.
Ramped up started as soon as temperature dropped below 7.9 K.
Right Septum operational after about 30 minutes from trip
FIGURE 1