• Main INDEX
  • Monthly INDEX
  • PREV
  • NEXT

    User name E. Cisbani

    Log entry time 06:04:10 on June25,2005

    Entry number 147161

    keyword=Right Septum Chart and Target Tickness

    The increase of the target thickness (see e-log 147154) has increased the bottom limit of the upper and lower coil temperatures and possibly the cooling cycle frequency.

    In the attached pictute, the target thickness has changed right after the turn-on of the beam, after -2 hour.


    FIGURE 1