Main INDEX
Monthly INDEX
PREV
NEXT
User name E. Cisbani
Log entry time 06:04:10 on June25,2005
Entry number 147161
keyword=Right Septum Chart and Target Tickness
The increase of the target thickness (see e-log 147154) has increased the bottom limit of the upper and lower coil temperatures and possibly the cooling cycle frequency.
In the attached pictute, the target thickness has changed right after the turn-on of the beam, after -2 hour.
FIGURE 1