Main INDEX
Monthly INDEX
PREV
NEXT
User name R. Michaels
Log entry time 09:41:17 on July13,2005
Entry number 147952
keyword=cavity 2 checkout
Here are runs to checkout cavity 2 with spectr. DAQ. The HAPPEX
DAQ was run also, but I don't have that info (separate halog).
Notation: cavity 2 is ~10 m from target, cavity 3 is ~2m.
(and cavity 1 is in BSY).
Gain adjustment tests
First adjusting on cav2.
run 2017
Nominal setting
q2 = 1677
x2 = 8000
x3 = 8000
run 2018
q2 -> 12400 (others same)
run 2019
q2 -> 730
run 2020
q2 -> zero
run 2021
q2 back to ~730
x2 -> 16000, y2 not changed
run 2022
q2 -> 1677 (original value)
x2 stays same
run 2023
q2 same
x2 -> 4000
run 2024
Position up to now was negative.
The phase on x2 was, up to now, -32767
Put x2 phase to +32767
Everything else stays the same
run 2025
Phase still +25000, x2 gain 5600
run 2026
x2 -> 2000 (lower gain)
run 2027
y2 gain adjusted. It was 8000 all this time, now to go 4000