• Main INDEX
  • Monthly INDEX
  • PREV
  • NEXT

    User name Moffit

    Log entry time 20:19:11 on July 14, 2005

    Entry number 148039

    keyword=HV Channels for S0, Scanner, and HAPPEX Detectors

    Here's a map of the HV channels used for this run:

    Left Arm:
        Slot 10,  Ch.  8    - HAPPEX Det 1
        Slot 10,  Ch.  9    - HAPPEX Det 2 (not installed)
        Slot 10,  Ch. 10    - Scintillator Scanner (counting mode)
        Slot 10,  Ch. 11    - Quartz Scanner (integrating mode)
        Slot  2,  Ch. 10    - S0-A
        Slot  2,  Ch. 11    - S0-B
    

    Right Arm (Top Crate): Slot 11, Ch. 10 - HAPPEX Det 3 Slot 11, Ch. 11 - HAPPEX Det 4 (not installed) Slot 10, Ch. 10 - Scintillator Scanner Slot 10, Ch. 11 - Quartz Scanner Slot 14, Ch. 10 - S0-A Slot 14, Ch. 11 - S0-B

    HAPPEX S0s have not been commissioned in beam. Cosmics HV setting has been around -1300V to -1400.

    A copy of this log entry has been emailed to: rom@jlab.org, paschke@jlab.org