    User name Z.-E. Meziani

    Log entry time 08:55:56 on July21,2005

    Entry number 148884

    keyword=Status update

    8:00 Shift start
    
    During the owl shift and just before the shift ended
    the target stable conditions were 
     Pressure: 218psi and Temperature: 6.41
    However while trying to run at 35uA to study the 
    left septum heating the previous crew reported that the beam tripped and came 
    back and the pressure excursion of the target went as high as 230 psi.
    
    Dave Armstrong suggested to temporarely reduce the tempetature 
    to reduce the pressure. It was carried by the owl shift crew around 
    8:00 am.
    Target pressure 212 psi target Temperature: 6.3 K
    
    We started the shift by asking for low beam current 5 uA while keeping an eye 
    on the target pressure. At 10 uA fluctuations 
    where as large as +/- 2psi.
    When the beam current was raised from 10 to 20 uA  the pressure fluctuations 
    were as large as +/- 10 psi. We decided to stop the beam and call Jian-Ping to 
    have an access and relieve the pressure of the target to 200psi. 
    At this stage we plan to go back to a pressure of around 200 psi and 
    6.4 K for the temperature. We should start taking production data soon after.
    A controlled access has been requested at 8:45.