    16:00 pm Start of the shift
    Controlled access and the techs are fixing Q2 of the right spectrometer.

    19:50 Q2 fixed and recycled. Momentum set back to the 2.732 GeV

    20:30 Run spot++ with new beam optics
    Start phase advance study

    run # 3770 phase advance study.

    21:35 Jay Benesh came back for tweaking his new optics.

    23:25 Finished Item 3 in the run plan established July 22 at 8:00pm
    Results logged entry # 149067

    23:40 Started the Septum I vs T scan (Item 4 in the run plan)

    24:00 End shift while in item 4.