User name Z.-E. Meziani
Log entry time 00:14:40 on July23,2005
Entry number 149076
keyword=Shift Summary
16:00 pm Start of the shift
Controlled access and the techs are fixing Q2 of the right spectrometer.
19:50 Q2 fixed and recycled. Momentum set back to the 2.732 GeV
20:30 Run spot++ with new beam optics
Start phase advance study
run # 3770 phase advance study.
21:35 Jay Benesh came back for tweaking his new optics.
23:25 Finished Item 3 in the run plan established July 22 at 8:00pm
Results logged entry # 149067
23:40 Started the Septum I vs T scan (Item 4 in the run plan)
24:00 End shift while in item 4.