    Here is the septum heating test WRT beam position.  As you can see there was no 
    significant change in temps due to the position changes.  The only noteworthy 
    position was BPMB y=3.
    
    Run      BPMA       BPMB       RUpCoil    RLoCoil   RYoke  Beam
    3780   1.6,-1.2  -1.4,-1.0     6.97       6.365     5.02   9.94
    3781   1.6,-1.4  -1.4,-2.0     6.97       6.365     5.02   9.94
    3782   1.6,-.2   -1.4,1.0      6.95       6.351     5.016  9.94
    3783   1.6,-.2   -1.4,2.0      6.96       6.355     5.018  9.94
    3784   1.6,-.2   -1.4,3.0      7.02       6.39      5.04  9.94
    
    The large Valley below in the charts is the entire duration of the test, all 5 
    settings.
    


    FIGURE 1

    FIGURE 2