• Main INDEX
  • Monthly INDEX
  • PREV
  • NEXT

    User name Moffit

    Log entry time 19:03:57 on July25,2005

    Entry number 149437

    keyword=HRS helicity signals unplugged

    I've removed the Helicity and QRT signals from the patch panels that go down to 
    the spectrometer (Pairsynch was not connected, and we need MPS for the HAPPEX 
    spectrometer crates).
    
    The cables have been 50 Ohm terminated, and the patch panels that they were 
    plugged into were labelled.