    E00-114 Run Plan July 26

    Goto HAPPEX How To Page

    Jul 26, 9:00, Rob Feuerbach, Run Coordinator (pager 584-7254)


    Remember to read the White Board

    Program: 

    1. Establish beam
    2. Production running at the +10% septum-excitation setting (page R.C. after run is started)

    Nominal and Production settings

    Establishing beam for the Helium target

    1. Before beam is permitted back into the hall after an extended down (more than 2hrs) or the beam tune has been changed, the target should be in the Empty position.
    2. If it is a new tune, take a HARP SCAN with an unrastered beam to check the intrinsic spot size.
    3. Verify the raster size by taking a pulser run with the spectrometer DAQ, with the prescale factors ps7 and ps8 set to 1 and running spot++. The actual size of the rastered beam spot is 1.5* the image dimensions in spot++. Iterate with MCC until the raster size is correct.
    4. Insert the Helium target, and ask for beam starting at a maximum current of 10uA and ramp up (over a minute) to the operating current while the target operator watches the HPH and CHL 4K He flow.

    Data-taking Tasks

    General Tasks:

    Please log below (and in the HALOG) any unusual observations and problems solved
    Date/Time Name Comment HALOG