• Main INDEX
  • Monthly INDEX
  • PREV
  • NEXT

    User name S. Bailey

    Log entry time 23:55:21 on July28,2005

    Entry number 149926

    keyword=Swing Shift Summary

    Swing shift summary:
    Shift workers:
    S. Bailey, T. Averett, J. Katich

    16:00 Continue phase advance studies
    16:45 End phase advance studies. Called MCC to adjust BPMA and BPMB x and y positions
    16:50 Move from empty target to 4He target
    17:00 Increase the current to 35 uA, in increments of 10 uA.
    17:00 Run 3921 to determine target boiling
    17:17 Production Run 3922
    17:20 Target ROC rebooted
    17:30 Called MCC to adjust BMPA X.
    18:05 Called MCC to request a controlled access to fix compton.
    18:10 Pedestal Run 3923
    19:05 Pedestal Run 3924
    19:10 Power Permit (bring up box supply)
    19:15 Beam Permit (bring up rf cavities)
    19:20 Increase the current to 35 uA, in increments of 10 uA.
    19:26 Production Run 3925
    20:44 Production Run 3926
    21:41 Compton Run 1610
    21:42 Production Run 3927
    22:20 Moller quads tripped. MCC will bring them back up.
    22:45 MCC is having difficulty bringing back the Moller quads. They are taking a controlled access to diagnose the problem.
    23:10 Power permit
    23:20 Beam permit
    23:20 MCC to tune beam in hall
    23:25 Increase beam current to 35 uA, in increments of 10 uA.
    23:33 Production Run 3928
    23:46 Start Compton Run