Main INDEX
Monthly INDEX
PREV
NEXT
User name R. Michaels
Log entry time 11:12:33 on August 5,2005
Entry number 150792
Followups:
keyword=Q2 measurements
Spectr. DAQ Run 2362, 2363, 2364 check DAQ, and spot++
09:54 HAP. run 4134 finished, we switch to spectr. DAQ.
HAPPEX det. goes to 1900(L), 1800(R).
Beam current 0.6 uA
Rates:
T1: 495 kHz
T2: 67.3 kHz
T3: 470 kHz
T4: 88.7 kHz
T5 = T6 = 0
T7 = 518 kHz
T8 = 557 kHz
Run 2365. Scint on, VDCs still off.
Turning VDCs on.
Run 2366. Looks good. Run ended at 620K events because beam
was lost.
Run 2367, repeat after the beam came back.
I have adjusted the "db_run.dat" to have a first guess at the
input parameters. Ebeam = 2.750 - dE/dx(3 MeV) = 2.747 GeV.
Angles taken to be 6 degr. for now. The resulting Qsq plots
are shown in fig 1, for each trigger. A cut on HAPPEX detector
ADC requires that some energy be in the detector; also cut on
number of tracks = 1 (the latter isn't too important).
No other cleanup cuts, for now.
The Q2 is nearly the same for each of the 3 triggers.
FIGURE 1