Log entry time 00:02:34 on August11,2005
Entry number 151422
keyword=Swing Shift Summary
16:00 Shift started with MCC doing beam studies in the Hall.
19:00 Talked to MCC they said that beam would be back in more than 1 hour.
21:00 Talked to MCC "they are working on it".
21:20 MCC says that we will get low CW beam.
21:49 Run flipper IWHP IN
21:50 Beam returns, positions not good they are adjusting.
22:23 Positions look good ask for production currents.
Production Runs IWHP IN
4278 22:24-23:21 100k
4279 23:40-
23:21 MCC asks us to move the tager to empty, so they can see the beam on the
dump.
23:33 MCC sees the beam on the dump. Moving target back to He.
23:54 Septum IOC is lost.
24:00 Shift ends rebooting IOCs seems to be coming back.