    User name lkaufman

    Log entry time 00:09:26 on September 2,2005

    Entry number 154185

    keyword=Swing Shift Summary

    Swing Shift Summary
    ----------------------
    
    Summary: Started the shift with low current cavity monitor commissioning and 
    then did the linearity scan.  After that, it was production for the rest of the 
    evening.  Before the end of the shift, we did a profile scan.
    
    -----------------
    
    16:00 - Low current cavity monitor commissioning.
    
    17:15 - finished with low current cavity commissioning
          - begin linearity study
    
    18:08 - ROC 26 died, kcoda'd and restarted runcontrol.
    
    18:10 - back to production
    
    20:00 - IHWP flippered in.
    
    21:30 - Beamline HV alarm - turned card off and on again.  Everything seems ok.
    
    23:48 - profile scan, but lots of beam trips
    
    SUMMARY of RUNS
    -----------------
    4917 - low I cavity commissioning
    4918 - low I cavity commissioning
    4919 - low I cavity commissioning
    4920 - check BPMs for linearity study
    4921 - linearity scan
    4922 - production, IHWP out, 45k good pairs
    4923 - production, IHWP out, 46k good pairs
    4924 - production, IHWP in, 44k good pairs
    4925 - production, IHWP in, 44.3k good pairs
    4926 - production, IHWP in, 47.8k good pairs
    4927 - production, IHWP in, 40k good pairs
    4928 - profile scan
    
    SPECTROMETER DAQ
    -----------------
    2598 - low I cavity commissioning
    2599 - low I cavity commissioning
    2600 - low I cavity commissioning
    2601 - low I cavity commissioning
    2602 - low I cavity commissioning
    2603 - low I cavity commissioning
    2604 - low I cavity commissioning