• Main INDEX
  • Monthly INDEX
  • PREV
  • NEXT

    User name R. Snyder

    Log entry time 00:05:51 on September14,2005

    Entry number 154658

    keyword=Swing Shift Summary

    16:00   MCC having trouble bringing Hall C up... no beam
    
    16:05   IHWP moved OUT and flipper was run
    
    18:15   MCC restored beam to Hall C and we're back to production
    
    22:35  ROC 23 was not responding. Rebooted and eventually came back okay
    
    
    
    
    
    Runs 
    ---------------------------------------------
    5026  prod.  47.2 k 
    	 -beam positions were not set until about halfway through run
    5027  prod.  46.5 k
    5028  prod.  45.7 k
    5029  prod.  22.5 k
    5030  junk
    5031  prod.  47 k
    5032  prod.  passed on to next shift