NEXT
User name Armstrong
Log entry time 16:22:41 on September25,2005
Entry number 155914
keyword=Day Shift Summary
Shift Summary: Day Shift Sept 25 2005
Shift Leader/Target: D.S. Armstrong
3rd: G. Urcioli
At start of shift: continuing with production running,
38.2 µA on 4He target. Run 5354 continuing. Hall C
is off completely (as is Hall B), so we are sole user at the moment.
IHWP is IN. Right septum upper coil gets up to 7.70 K with 40 minutes
of steady beam. Beam is very nice and steady.
9:45 Page Ryan, at the RC's suggestion, to arrange the
remaining RHWP scans to take advantage of Hall C being off.
Ryan explains to me what is needed, and we decide that Guido and I
can do the scans ourselves, without requiring the experts (Ryan
or Lisa) to come in...
10:35 We end Run 5357 early after 25 K good pairs, to start the
source scan.
RHWP Source Scan:
- end run 5357
- feedback off (type this at command prompt on an apar@adaql account)
- dithering off (using Green Monster)
- set Pockels cell voltages by hand to 180 V offsets using the
"Laser Polarization & Parity Controls" medm screen:
GUN3 PITA POS voltage was 7.262 V, set to 4.262 V
" " NEG voltage was 4.063 V, set to 7.262 V
- 10:44 Start HAPPEX run 5358, IWHP in, RHWP scan
- once CODA started, invoke "auto_rhwp" at the ROC23 VxWorks window
- script starts, watch the RHWP update every 50 seconds in the Runbird
window
- 11:06 script ends, end run 5358
- call MCC, ask to remove IHWP
- run flipper, but do not increment slug number (we are in slug 117)
- set Pockels cell voltages by hand:
GUN3 PITA POS voltage was 7.160 V, set to 4.160 V
" " NEG voltage was 4.400 V, set to 7.400 V
- 11:10 Start HAPPEX run 5359, IHWP OUT, RHWP scan
- once CODA started, invoke "auto_rhwp" at the ROC23 VxWorks window
- script starts, watch the RHWP update every 50 seconds in the Runbird
window
- 11:32 script ends, end run.
- call MCC, insert IWHP again.
- run flipper, don't increment slug number.
- feedback on
- dithering (aka beam modulation) on
- 11:36 Start HAPPEX run 5360, production again
Beam is marvelously stable throughout the scan.
12:34 removed IHWP, ran flipper.
Meanwhile, find that Compton was off, DAQ hangup; did a CODA reboot and
restart. DAQ comes back up OK, and new run starts OK, but cavity power
is zero. Laser is on, but cavity is not locked. Try the cavity lock
instructions: Servo ON, slow Ramp procedure. No joy. Try a few
more times, adjusting the "tracking level" down to 0.3 as per
instructions. Still no joy. Page Sirish, but no answer yet.
13:30 Sirish calls; he has relocked cavity from home, but only at low
power (150 W) instead of the 400 W we have had recently. Perhaps some
laser resteering needs to be done? He will continue to work on it.
At this low power our signal/noise would be rather marginal.
14:15 Sirish has resteered the Compton laser beam using the
mirrors, and now the cavity power is around 500 W. I start a new
Compton run (12297).
15:45 Did a scanner run (run 5365).
16:00 Hand off to next shift, production run 5365 is underway; some
trouble with that silly piece of software known as BTA.
HAPPEX Runs Taken
Run Pairs IHWP
5354 45 K IN Production
5355 48 K IN Production
5356 48 K IN Production
5357 25 K IN Production
5358 18 K IN RWHP source scan - not production
5359 20 K OUT RWHP source scan - not production
5360 49 K IN Production
5361 48 K OUT Production - start of slug 118
5362 46 K OUT Production
5363 33 K OUT Production
5364 OUT Q2 scanner run - not production
5365 (underway) OUT Production
Compton Runs Taken
Run 12297 82.2% polarization, signal/background = 7.2
Run 12298 (still underway)