• Main INDEX
  • Monthly INDEX
  • PREV
  • NEXT

    User name R. Michaels

    Log entry time 23:50:34 on October12,2005

    Entry number 156680

    keyword=R-HRS alignment

    Run 2815 was a repeat of 2814, while we were waiting.

    Next we go for -2%.
    P_L = 3.06544, P_R = 3.06456

    Rates
    T1 = 205 kHz
    T2 = 18.6 kHz
    T3 = 194 kHz
    T4 = 12.8 kHz
    T5 = T6 = 0
    T7 = 304 kHz
    T8 = 273 kHz

    Run 2816 at dP = -2%.

    We can align the Right HRS. (For Left HRS with one detector
    missing, I don't want to do this yet. We need to fix that.)
    See fig 1. Comparing T1 to T2 for run 2816, it's clear we need
    to move 53 MeV. This puts superelastic edge (labelled "1") to
    the right edge of detector (corresponding "1"). The width of
    the 2-segment detector is evidentally 41 MeV (labelled "2").

    So, the aligned R-HRS momentum is 3117.6 MeV


    FIGURE 1