User name Armstrong
Log entry time 16:01:58 on October13,2005
Entry number 156745
keyword=Day Shift Summary
Shift Summary: Day Shift October 13 2005
HAPPEX-II hydrogen
Shift Leader/Target: D.S. Armstrong
Target: R. Gilman
3rd: J. LeRose
At start of shift: Kent is here as well; just at start of shift we get 5 µA of beam, back to nominal beam positions.
We have target full, but in empty position. Take a HAPPEX DAQ run to
look at phase advance and dithering. We are running at the moment
with the Hall B laser, as the Hall A laser will not lock, and EGG needs to do an access to fix that today.
8:30 We check the phase advance with 5 µA beam.
Looks good in x,y - Kent pronounces it fine after pumping up the amplitude in one coil. Now MCC takes beam to allow Matt Poelker to fix the Hall A laser.
Pedestal/cosmic runs underway while we wait.
10:00 Elog says Matt has fixed the Hall A laser, and it is now
locked. Now they are going to the "energy conservation" test plan (in
which the higher-pass arc magnet power supplies are turned off). Matt will also be resetting the Wein filter/precession solenoid magnet to zero-out the vertical polarization.
16:00 Still waiting for beam... Hand off to next shift...
HAPPEX Runs Taken
Run Pairs Comment
5588 45 K beam study - phase advance check
5589 100 K Cosmics/Pedestals
5590 100 K Cosmics/Pedestals
5591 100 K Cosmics/Pedestals
5592 100 K Cosmics/Pedestals
5593 100 K Cosmics/Pedestals
5594 100 K Cosmics/Pedestals
5595 100 K Cosmics/Pedestals
5596 100 K Cosmics/Pedestals
5597 100 K Cosmics/Pedestals