Main INDEX
Monthly INDEX
PREV
NEXT
User name E. burtin
Log entry time 00:00:07 on October14,2005
Entry number 156761
keyword=evening shift summary
16:30 5 muA CW beam in the hall for optics optimization and compton tune.
17:50 harp scans in the arc to check beam size.
then beam tuning in the compton until the end of the shift.
the result of the tune is not satisfactory for the photon detector (3000 Hz/muA) and acceptable for the electron detector (15-20Hz/muA).
MCC will continue some tests on the adiabatic damping for a while.