    User name R. Michaels

    Log entry time 03:33:57 on October14,2005

    Entry number 156776

    This entry is a followup to: 156760

    keyword=very modified run plan

    MCC informs us of their own plan:
    1. A "capture" of the injector. This takes an hour.
    2. Set up beam to hall B. This takes 2 hours.
    Optimistically we can resume our own plans which require beam
    at 06:30. Target remains in empty position meanwhile.