• Main INDEX
  • Monthly INDEX
  • PREV
  • NEXT

    User name R. Michaels

    Log entry time 07:51:07 on October14,2005

    Entry number 156779

    keyword=owl summary

    Started the shift with Chao checking adiabatic damping.
    Then did a brief check of phase advance (see halog).
    Next, MCC took the beam for "capture" of injector and setup Hall B.
    No usable beam for nearly the entire shift.
    At the end of the shift the beam was starting to appear in Hall A.
    Some tuning left.