    User name adaq

    Log entry time 00:07:55 on October 15, 2005

    Entry number 156887

    keyword=Beam Time Accounting
    Hall A

    10/14/05 1600-2400
    Experiment #: E99-115
    Shift Leader: E. Burtin
    Shift Workers: K. Slifer, A. Acha

    16001700180019002000210022002300Total Time
    Acceptable Beam
    in Use
    0.690.250.670.650.570.520.620.844.82
    Beam Available
    but Not in Use
    0.310.000.330.090.290.150.160.011.33
    Beam Not Available
    or Unacceptable
    0.000.750.000.270.130.330.220.151.85
    Accelerator Con-
    figuration Change
    0.000.000.000.000.000.000.000.000.00
    Experiment
    Ready
    1.001.001.001.001.001.001.001.008.00
    Planned Config-
    uration Change
    0.000.000.000.000.000.000.000.000.00
    Unplanned
    Experiment Down
    0.000.000.000.000.000.000.000.000.00
    Hall not
    ready reasons
    Target0.000.000.000.000.000.000.000.000.00
    Data Acq0.000.000.000.000.000.000.000.000.00
    Other0.000.000.000.000.000.000.000.000.00
    HRSL0.000.000.000.000.000.000.000.000.00
    HRSR0.000.000.000.000.000.000.000.000.00
    HALL_OFF0.000.000.000.000.000.000.000.000.00

    Comments: Run 5609 30uA, production style. Dithering disabled. Compton interaction region optimization. 16:39 - started run 5609 16:50 - beam gone for 10-15 minutes to fix Hall B problem. 17:10 - MCC called to say that there would be no beam for at least 20 min more. 17:39 - 30 uA of beam back in Hall A 17:55 - Compton interaction point tuning done 18:05 - MCC has viewers in, beam back in 10-15 minutes. 18:13 - 30 uA of beam back in Hall A 19:15 - request new raster setting 9x12 19:40 - lots of beam trips in the last 1/2 hour. 20:00 - request new raster setting 6x12 20:20 - scanner run 21:30 - go to 40 muA 21:45 - jt valve open so that we can go higher in beam current 22:10 - go to 50muA 23:00 - go to 60muA after having raised the trip limit on the ion chamber in the left dump 23:30 increase fan speed to 65Hz 23:45 increase fan speed to 70Hz Summary of runs ------------------ 5607 - boiling check 5608 - global check 5609 - global check, dithering off 5610 - pedestal run 5611 - global check, dithering off for Compton interaction point setup 5612 - production style, dithering on again. 5613 - raster 9x12 3k good pairs 5614 - raster 9x12 10k good pairs 5615 - raster 6x12 10k good pairs 5616-5621 scanner runs 5622 - 40muA HV tune 5623 - 40muA 5624 - 50muA HV tune 5625 - 50muA 5626 - 53muA HV tune 5627 - 60muA HV tune 5628 - 60muA - 60Hz fan speed 5629 - 60muA - 65Hz fan speed 5630 - 60muA - 70Hz fan speed 5631 - 60muA - 73Hz fan speed

    Data Entry by: E. Burtin