• Main INDEX
  • Monthly INDEX
  • PREV
  • NEXT

    User name D. Lhuillier

    Log entry time 23:42:42 on October15,2005

    Entry number 156993

    Followups:

    keyword=Run plan

    Tentative run plan for tonight when both septa are ready:

    *Check alignment with the updated left HRS and septum settings suggested by Bob and Robert:
    P0=3.1234 GeV/c Iseptum=323.61 A

    *Perform dipole scan to study rescattering background.

    *Measure the sensitivity of the rate in HAPPEx detector to de-tune of Q3.

    *Take one arm data at high current.