Main INDEX
Monthly INDEX
PREV
NEXT
User name D. Lhuillier
Log entry time 23:42:42 on October15,2005
Entry number 156993
Followups:
keyword=Run plan
Tentative run plan for tonight when both septa are ready:
*Check alignment with the updated left HRS and septum settings suggested by Bob and Robert:
P0=3.1234 GeV/c Iseptum=323.61 A
*Perform dipole scan to study rescattering background.
*Measure the sensitivity of the rate in HAPPEx detector to de-tune of Q3.
*Take one arm data at high current.