• Main INDEX
  • Monthly INDEX
  • PREV
  • NEXT

    User name J. Singh

    Log entry time 04:13:46 on October18,2005

    Entry number 157258

    keyword=MCC called: problem solved, beam back

    at 0344, MCC called to tell us that they were sending us beam.  we checked the 
    raster with spot++ for SPEC DAQ run 2869, looks ok (x=4mm by y=2mm).
    
    HAPPEX run 5708 has a 25 min period of beam off