• Main INDEX
  • Monthly INDEX
  • PREV
  • NEXT

    User name J. Singh

    Log entry time 07:50:37 on October18,2005

    Entry number 157272

    keyword=MCC tweaked beam position

    at 0640, i called MCC to tweak our beam position at BPMB (1H04B).
    at 0647, they called back and said that they did it.  they did and it looked 
    good.
    
    	before	after
    BPMBx	-1.6	-1.4
    BPMBy	+0.2	+0.0
    (all units mm)