• Main INDEX
  • Monthly INDEX
  • PREV
  • NEXT

    User name Xiaodong Jiang

    Log entry time 16:07:48 on October19,2005

    Entry number 157432

    keyword=Day Shift Summary

    Day Shift Summary

    8:00 Started shift with run #5738.
    Beam current 58.0 uA. Injector insertable waveplate: IN.
    Left HRS at 3.1234, Right HRS at 3.1126.
    L-Septum upcoil T=6.686K, R-Septum T=7.377K.
    Target, 20 cm LH2, T-19.0, Fan=90.9Hz, HPH=111watt.
    raster on. BPMA: x=1.549, y=-0.019. BPMB: x=-1.416 y=0.099.
    Compton running, run#12422.
    9:10. left spectrometer IOC down. quards were down. run 5739 is junk.
    9:40. Reset left magnets, everything agree with earlier magnet log entry, start run 5740

    1:44 pm. beam down.
    2:16pm. Called MCC, beam might be back in 30minuts.
    2:42 pm. beam back. asked 5uA to check spot++.
    2:47 pm, spot++ check was all right, 4mm*2mm. asked for 58 uA. start run 5746.
    3:44 pm. Beam off. While we lost left arm IOC again. All magnet on left arm were lost. Quickly reboot IOC through the web. Cycle left Q2 and Q3. Set left arm to 3.1234
    4:05 maget all reset. beam back 5 uA

    Good runs
    Run number OK pairs
    5738 43.1k
    5739 junk
    5740 50.0k
    5741 43 k
    5742 42.5k
    5743 41.9k
    5744 8.2k
    5745 no beam run.
    5746 32k
    5747 left arm magnet off.