Main INDEX
Monthly INDEX
PREV
NEXT
User name Averett
Log entry time 23:59:57 on October19,2005
Entry number 157455
keyword=Swing Shift Summary
16:00 Beam down
16:20 Resume production running
17:07 MCC will do PZT scan now
17:25 PZT scan done, resume production running
20:20 Ask MCC to put IHWP to OUT position
21:20 MCC requests 5 minutes for some PZT test.
21:30 Resume production running.
22:25 MCC does PZT test near end of run 5753 without telling us.
23:25 Coulombs collected on swing shift up to end of run 5754 is 0.99C
NOTE: BPM12 saturated several times on this shift. Need to keep an eye on it!