• Main INDEX
  • Monthly INDEX
  • PREV
  • NEXT

    User name Averett

    Log entry time 23:59:57 on October19,2005

    Entry number 157455

    keyword=Swing Shift Summary


    16:00 Beam down
    16:20 Resume production running
    17:07 MCC will do PZT scan now
    17:25 PZT scan done, resume production running
    20:20 Ask MCC to put IHWP to OUT position
    21:20 MCC requests 5 minutes for some PZT test.
    21:30 Resume production running.
    22:25 MCC does PZT test near end of run 5753 without telling us.
    23:25 Coulombs collected on swing shift up to end of run 5754 is 0.99C

    NOTE: BPM12 saturated several times on this shift. Need to keep an eye on it!