• Main INDEX
  • Monthly INDEX
  • PREV
  • NEXT

    User name Piotr D.

    Log entry time 07:33:48 on October21,2005

    Entry number 157576

    keyword=Owl shift summary

    1. At 2:30am after run 5784 HW plate was flipped to OUT
    2. Production runs 5785 - 5789 until 5:30am when right Q2 tripped, Bob called - access to Hall A needed to reset teh magnet.
    3. At 6:00am spectrometer IOC froze - Bob rebooted it.
    4. 6;45 - access and hard reboot of Q2 in the hall.
    5. 6:50 - during cycling Q2 overheats and trips again
    6. Access again
    7. 7;30am - beam back, production runs started.