Main INDEX
Monthly INDEX
PREV
NEXT
User name Piotr D.
Log entry time 07:33:48 on October21,2005
Entry number 157576
keyword=Owl shift summary
1. At 2:30am after run 5784 HW plate was flipped to OUT
2. Production runs 5785 - 5789 until 5:30am when right Q2 tripped, Bob called - access to Hall A needed to reset teh magnet.
3. At 6:00am spectrometer IOC froze - Bob rebooted it.
4. 6;45 - access and hard reboot of Q2 in the hall.
5. 6:50 - during cycling Q2 overheats and trips again
6. Access again
7. 7;30am - beam back, production runs started.