Heidi sugested check of LL meter, noted that the 30% offset was still there. Control point for the LL at cryo was 71%. with the offset all we could get to was 70.1%.
Reset cryo set point to 68% and the valve closes, problem seems to be in the meter or the isolation module.
During process the right dipole quenched, awaiting refill......
A copy of this log entry has been emailed to: fansler@jlab.org