    User name Saha/Sawatzky

    Log entry time 16:04:52 on October27,2005

    Entry number 158168

    keyword=Shift Summary

    Shift Summary:
    ----------------

    08:00 Waiting for right dipole to ramp

    08:30 Mott measurement started (no beam for hall)

    11:00 Mott completed and backed out. Hall B laser not locked -- beam down while injector group works. See other halog entries on B-laser bleed through issue.
    Polarization: ~86%

    15:30 MCC/Injector group had several problems getting B-laser lock back and restoring beam. First good production beam this shift.


    Happex Run Summary:
    -------------------

    5930: JUNK (negligible beam) Production Run with only Left, Right Arm Septum Ramping Up.

    5931: Production run (both arms)


    Compton Run Summary:

    12351: started 15:30