Main INDEX
Monthly INDEX
PREV
NEXT
User name sawatzky
Log entry time 08:20:12 on October 28, 2005
Entry number 158270
This entry is a followup to: 158158
keyword=Bleedthrough measurement will be done next time B laser spontaneously loses lock
The bleedthrough measurement is in the PD's shift plan and will be done
opportunistically then next time B laser spontaneously loses lock.
MCC doesn't want to intentionally break the lock right now in case they
can't get it back.