• Main INDEX
  • Monthly INDEX
  • PREV
  • NEXT

    User name Ramesh

    Log entry time 16:01:18 on October30,2005

    Entry number 158509

    keyword=Shift Summary

    Shift starts with the run 5999 from owl shift.

    Close to the end of the run 5999 Roc26 stopped responding, ended the run prematurely.

    During the run 6000,after seeing poor Copton signal,Brad suggested to tell the MCC to tune the beam. After a while Compton spit a good signal.


    Run .... Events .... Good Pairs
    5999 .... 85 K .... 37.4 K
    6000 .... 100K .... 41.2K
    6001 .... 100K .... 32.8K
    6002 .... 100K .... 37.1K
    6003 .... 100K .... 37.1K
    6004 .... 100K .... 30.0K
    6005 .... 100K .... 41.9K
    6006 .... 70K .... 27.2K

    6007 continuing to the swing shift.

    Shift was very smooth except one time ROC26 failure and one time bad Compton signal.