User name Armando Acha
Log entry time 00:05:45 on October31,2005
Entry number 158559
keyword=Shift summary
Swing Shift:
Crew:
SL/TO: Armando Acha
TO/3rd. Salvatore Frullani
16:00: Run 6007 half its way. Things running smoothly.
16:25: Run 6007 done. 30.9K pairs.
16:46: Called MCC to move BPMB x from -1.217 to -1.400.
17:21: Run 6008 done. 44.1K pairs.
18:18: Run 6009 done. 31.9K pairs.
19:19: Left Arm Trip.IOC Rebooted. We keep running with right arm.
19:22: Run 6010 done. 33.8K pairs.
19:25: Run 6011 stopped. 4K pairs.
20:00: Left arm back. Q2 and Q3 were cycled.
20:00: Run 6012 stopped. 16.4k pairs. Left arm back now for next run.
* Pairs obtained from runs 6011 and 6012 must be divided by 2 (right arm only).
20:58: Run 6013 done. 23.1K pairs.
21:24: Run 6014 stopped to flip the IHWP (from IN toOUT). 6.5K pairs.
Compton Run 12581 stopped.
21:34: IHWP is OUT and Slug number is 17.
21:44: Run 6015 stopped. MCC PZT test. Compton run 12583 stopped too.
Run 6015: 3.6K pairs.
22:02: PZT test done. Raster sie wil be checked at 5uA.
22:08: Raster size fine. Back to production!! :-)
22:35: Compton Run 12584 stopped. ROC 5 failed.
22:41: Run 6016: Full BPM saturation observed after PZT test.
Stopped at 23:05. Almost no pairs. Saturation problem fixed.
new run will be started. Thank you Brad.
00:00 Run 6017 done. 44.6K pairs.
Some problems prevented us from having a very producitve shift. We lost left arm for a while and unstable beam. Some saturation was observed also in run 6016 but finally everything was fixed and things were left running smoothly.