Main INDEX
Monthly INDEX
PREV
NEXT
User name sawatzky
Log entry time 17:28:37 on October31,2005
Entry number 158631
Followups:
keyword=Shift Workers: regularly check FFB after beam trips
Shift Workers: keep a close eye on the fast feedback (FFB) status, particularly after beam trips.
I've added the three FFB epics variables to the BPM strip chart on the 'septa' workspace. The three green lines at the top of the screen snapshot reflect the ON status. If one of the feedbacks turns off the associated line will (should) drop to the bottom of the screen (OFF status). If that happens, call MCC and request that it be turned back on.
FIGURE 1