• Main INDEX
  • Monthly INDEX
  • PREV
  • NEXT

    User name J. Singh

    Log entry time 07:45:21 on November 7,2005

    Entry number 159377

    keyword=owl shift summary


    Owl Shift Summary
    Taking production. Since 2314 11/06/05, Hall B has been down b/c of "laser lock issues."
    At 0526, beam is gone for injector access to fix hall B laser problems.
    We didn't get a chance to do a profile scan.

    Owl Shift Log

    0000:0032 Taking over happex run 6223 from swing shift
    0032:0128 happex run 6224
    0128:0225 happex run 6225
    0225:0321 happex run 6226
    0243 noticed that runbird had wrong parity run number, HALOG 159352
    0321:0354 happex run 6227, ended early b/c we lost left HRS
    0354:0416 happex run 6228, right only while left HRS recovers, HALOG 159364
    0416:0512 happex run 6229, back to "two-arm" production
    0512:0526 happex run 6230, ended early b/c beam gone for injector access, HALOG 159369
    0526:0736 happex runs 6231,6232,6233 are cosmic
    0736:0800 preparing to return to production

    People on Shift

    Franco Garibaldi
    Jaideep Singh

    Experimental Parameters

    beam current = 57.5 +/- 0.2 microamps
    target = LH2 in Loop 2 [T = 19.00 +/- 0.02 K, P = 23.9 +/- 0.2 psi, fan frequency = 90.92 +/- 0.02 Hz]
    left HRS (set) = 3.12340 GeV/c right HRS (set) = 3.11260 GeV/c
    left septum (set) = 323.61 A right septum (set) = 316.92 A
    sweeper magnet (set) = 111.0 A

    Runs Summary

    happex time run# type BHWP equivalent "ok" two-arm pairs
    2336:0032 6223 production IN 42169, no Hall B
    0033:0128 6224 production IN 37717, a few helicity errors and no Hall B
    0129:0225 6225 production IN 39319, a few missing dithering slope histogram from prompt, no hall B
    0225:0321 6226 production IN 43150, a few helicity errors and no hall B
    0321:0354 6227 production IN 24755, ened early b/c lost left HRS, no hall B
    0355:0416 6228 production IN 5378, right arm only, no hall B
    0417:0512 6229 production IN 43400, no hall B
    0513:0526 6230 production IN 7452, ended early b/c beam gone, no hall B
    0528:0624 6231 cosmic IN 100k events
    0624:0720 6232 cosmic IN 100k events
    0720:0736 6233 cosmic IN 27.5k events, ended early in anticipation of beam

    total number of "ok" pairs = 243.3405 kilopairs
    estimated "two-arm" production = 0.908 C
    estimated shift productivity = 0.608

    compton time run# (beam polarization)*(photon polarization) [stat err only] or comments
    2339:0145 12734 -(85.3 +/0 0.5)%, end run failed, so coda reboot
    0203:0414 12735 -(84.8 +/- 0.5)%, ROC5 died at the end and end run failed, so coda reboot
    0427:0526 12736 -(86.3 +/- 0.9)%, end early b/c beam gone, end run failed so coda reboot