keyword=Source Summary after Cathode Spot Mov
After the spot move, PITA scans were performed for IHWP IN and OUT and
transmission runs for each state as well. All the relevant parameters were
changed in the appropriate feedback files and are listed below
IHWP IN:
+HV = 7.302
-HV = 3.079
PITA Slope = 8.25 ppm/V ---> 495 ppm/DAQ V.
IHWP OUT:
+HV = 7.330
-HV = 3.138
PITA Slope = -8.39 ppm/V ---> 503.4 ppm/DAQ V.
The runlist for these source studies follows:
Run 6266 PITA but forgot to turn Aq feedback off
Run 6267 PITA Scan --> 8.25 ppm/V
Run 6268 Transmission Check --about 10 min. run
IHWP moved out
Run 6269 PITA but needed to turn off beam modulation
--I don't know why it was on. It wasn't before
Run 6270 PITA but forgot the scanclean was on -120
Run 6271 PITA Scan ---> -8.39 ppm/V
Run 6272 Transmission check
IHWP move IN -->slug number not incremented
Back to production beginning slug 28