Main INDEX
Monthly INDEX
PREV
NEXT
User name Bosted
Log entry time 15:59:30 on November 8,2005
Entry number 159524
keyword=Day shift Summary
8:00 Continue production running on LH2 from owl shift
9:05 Hachemi takes over Compton to do some linearity tests.
10:00 Beam off for spot move. Requested half wave plate change also.
11:35 Spot move complted. Ryan Snyder starts some PITA scans.
12:10 Completed PITA scan with half wave IN. Started scan half-wave OUT
12:40 PITA scan done. Moved back to half-wave plate IN and start
production mode on slug 28.
13:10 Hachemi finished linearity tests of Compton, and moved the
analysis back to the regular mode.
14:25 "lake Shore Init" button pressed by mistake: caused Left
septum current to go to zero in middle of run 6274.
14:40 Started left suptum to ramp up again. Started run 6275
with right arm only. Lowered beam current to 55 muA because right
septum temperature was getting too high.
15:00 Right Q2 tripped. Would not reset easily. This was just before
the end of run 6275.
15:15 Requested acess to reset Q2.
15:40 q2 IS NOW RESET AND RAMPING UP.
15:45 sIRISH IS GOING IN TO THE hALL TO SET A cOMPTON VOLTAGE
No shift leader was scheduled for this shift, so
Jaideep Singh stayed an extra 2 hours gavde us a lot of
instruction (thanks!)
nEXT SHIFT: PLEASE MAKE SURE SIGN OF RIGHT q2 IS CORRECT
BY DOING A SCANNER RUN AND CHECKING RATES ARE NORMAL.
Run summary
happex time run# type BHWP equivalent "ok" two-arm pairs
0733:0829 6261 production OUT 43000
0831:0927 6262 production OUT 42000
0930:1001 6263 production OUT 25663
1002:11:01 6264 cosmic x 0
1102:1137 6265 cosmic x 0
x 6266 junk x x forgot to turn on aq
x 6267 PITA scan IN x
x 6268 transmission check IN x
x 62690 junk
x 6270 junk
x 6271 PITA SCAN OUT
x 6272 transmission chack OUT
1243:1339 6273 production IN 36000
1341:1437 6274 production IN 38000 2nd half had right arm only!!
1442:1504 6275 production IN 7000 RIGHT ARM ONLY 55 MUa