NEXT
User name J. Singh
Log entry time 08:07:04 on November14,2005
Entry number 160082
keyword=owl shift summary
Owl Shift Summary
Back to production at the beginning of the shift after a long down due to problems on ACC side.
Taking production and we're told to let the day shift worry about a profile scan.
SLUG 32 (OUT) total so far = 547.5 kilopairs
Owl Shift Log
0000:0010 preparing to resume production, HALOG 160060
0010:0108 happex run 6403
0108:0204 happex run 6404
0204:0300 happex run 6405
0300:0356 happex run 6406
0356:0453 happex run 6407
0453:0550 happex run 6408
0532:0558 beam gone for QE measurement among other things
0550:0647 happex run 6409
0647:0744 happex run 6410
0744:0800 happex run 6411 handed over to day shift
People on Shift
Jaideep Singh
Al Tobias
Experimental Parameters
beam current = 57.6 +/- 0.2 microamps
target = LH2 in Loop 2 [T = 19.00 +/- 0.02 K, P = 23.8 +/- 0.2 psi, fan frequency = 90.92 +/- 0.02 Hz]
left HRS (set) = 3.12340 GeV/c right HRS (set) = 3.11260 GeV/c
left septum (set) = 323.61 A right septum (set) = 316.92 A
sweeper magnet (set) = 111.0 A
Runs Summary
happex time run# type BHWP equivalent "ok" two-arm pairs
0010:0108 6403 production OUT 34276, 7.4% BPM saturated pairs probably due to gain search after long beam down
0109:0204 6404 production OUT 35514
0205:0300 6405 production OUT 45631, a top 5 run!
0301:0356 6406 production OUT 33168
0357:0453 6407 production OUT 39807
0453:0550 6408 production OUT 22702, beam gone for QE measurement, a few helicity errors
0552:0647 6409 production OUT 32994
0648:0744 6410 production OUT 35770
0745:xxxx 6411 production OUT ?
total number of "ok" pairs = 279.9 kilopairs
estimated "two-arm" production = 1.048 C
estimated shift productivity = 69.9 percent
compton time run# (beam polarization)*(photon polarization) [stat err only] or comments
0039:0230 12853 +(87.3 +/- 0.8)%, ended early b/c ROC1 died
0242:0445 12854 +(89.1 +/- 0.6)%, ended early b/c ROC2 died
0509:0715 12855 +(88.7 +/- 0.6)%, end run failed, coda reboot
0726:xxxx 12856 ?