• Main INDEX
  • Monthly INDEX
  • PREV
  • NEXT

    User name LeRose

    Log entry time 16:07:29 on November16,2005

    Entry number 160367

    keyword=Shift Summary

    Day shift 11/16/05
    D. Higinbotham (SL)
    J. LeRose (TO)
    B. Craver (3rd)

    Program is production running
    slug 35 IHWP is OUT

    09:26 ESR problems cause multiple spectrometer magnet trips
    10:30 go to controled access for oportunistic maintenance
    13:20 begin target cooldown and start restoring magnets

    run start/stop events comments
    6493 07:50/8:45 100K


    compton run start/stop
    12880 06:59/09:24

    By the end of the shift all magnets are back on and the right HRS
    dipole is neverly back (the rest are fully energized).

    J.P. is finishing the cool down of the target.