NEXT
User name A. Tobias
Log entry time 08:26:36 on November18,2005
Entry number 160548
keyword=Owl Shift Summary
Owl Shift Summary
Taking production data. IHWP is OUT at beginning of shift.
SLUG 37 (OUT) total so far approx =
Owl Shift Log
2312:0008 happex run 6526
0011:0105 happex run 6527
0107:0154 happex run 6528 <-- no beam for last part of run
0158:0228 cosmics run 6529 <--- no beam
0229:0325 happex run 6530
0327:0423 happex run 6531
0425:0521 happex run 6532
0522:0617 happex run 6533
0618:0730 happex run 6534
0734:0752 happex run 6535 <--- beam modulation script not on?
0753:0758 cosmics run 6536 <--- no beam, small run 2K
People on Shift
Arie Beck
Bob Michaels
Al Tobias
Experimental Parameters
beam current = 58 microamps
target = LH2 in Loop 2 [T = 19.00K, P = 22.4psi, fan frequency = 91Hz]
left HRS (set) = 3.12340 GeV/c right HRS (set) = 3.11260 GeV/c
left septum (set) = 323.61 A right septum (set) = 316.92 A
sweeper magnet (set) = 111.0 A
Runs Summary
happex time run# type BHWP equivalent "ok" two-arm pairs (Coulombs)
2312:0008 6526 production OUT 29072 (0.110)
0011:0105 6527 production OUT 39881 (0.152)
0107:0154 6528 production OUT 15527 (0.059)
0229:0325 6530 production OUT 32359 (0.123)
0327:0423 6531 production OUT 35833 (0.136)
0425:0521 6532 production OUT 33033 (0.125)
0522:0617 6533 production OUT 40074 (0.153)
0618:0730 6534 production OUT 32761 (0.125)
0734:0752 6535 production OUT 4179 (0.015) <--- beam modulation script not on?
compton time run# (beam polarization)*(photon polarization) [stat err only] or comments
2335:0056 12903 +(90.5 +/- 0.7)% end run due to question in strip chart
0104:0155 12904 +(86.6 +/- 1.5)% end run, due to beam downtime, ROC5 not responding, did coda beboot at 0230 when beam came back.
0243:0450 12905 +(90.2 +/- 0.6)% run ends, but ROC0 not responding, do coda reboot.
0529:0724 12906 +(91.1 +/- 0.8)% end run since ROC2 was not responding, then coda reboot.
0737:0753 12907 +(85.3 +/- 3.1)% ended run due to lack of beam.
Other Events
0130 MCC called to say they have magnet problems and estimate they will have beam back in 5 to 10 minutes.
0153 MCC called to say they could not cycle a bunch of magnets. There might be a communication problem, they tried to reboot an IOC which did not work. They called in additional help. No time estimate yet.
0225 MCC called to say they will be sending cw beam again.
0730 Noticed ROC25/ROC26 disconnected in main happex DAQ runcontrol, run#6534 end premature @ 82K events.
0752 MCC called to let us know that there are major instablilities in the beam. They mentioned that they had to close a vacuum valve in the A-line. They are looking into the problem. In the meantime, we ended happex production run #6535 and are taking cosmics data with run #6536. We also ended the compton run.
0758 MCC called to say they will give us beam back! Next production run is during day shift.