• Main INDEX
  • Monthly INDEX
  • PREV
  • NEXT

    User name B. Craver

    Log entry time 16:00:46 on November19,2005

    Entry number 160680

    keyword=Day shift summary

    Roughly 5.5 hours of production.
    Beam down for period of 2.5 hours.
    Note that runs 6556 and 6566 were run with the IHWP in a new position (OUT)
    without running flipper.

    Run Summary
    -----------
    08:00 Begin shift taking production with IHWP in IN position.

    Run Events Good Pairs
    6562 100 k 36.6 k
    6563 100 k 40.0 k
    6564 100 k 38.7 k

    10:25 Move IHWP to OUT position

    6565 100 k 34.2 k
    6566 77 k 26.0 k

    Tim Holmstrom notifies me that I did not run flipper after run 6564.
    We stop run 6566, run flipper and continue data taking.

    6567 100 k 39.8
    6568 55 k 3.0 k

    13:10 - 15:48: Beam is down. Stop run 6568 and take cosmics data (runs 6569, 6570, 6571.)

    Resume production with run 6572