• Main INDEX
  • Monthly INDEX
  • PREV
  • NEXT

    User name R. Michaels

    Log entry time 22:12:03 on November21,2005

    Entry number 160934

    keyword=Pb tests, part 2

    Alignment check. Going to dP = -2 % = 1.0775 GeV. Run 3130.
    Based on this we decide that the good momentum setting is
    same for both arms: P0 = 1.1005 GeV.

    Fig 1 == detectors. It shows that: (i) ADC amplitudes still not
    very high inspite of 2000V. (ii) Data seems to be mostly in
    L-det2 and R-det1 in spectr-DAQ language.

    Fig 2 = Alignment criteria. This histogram is filled with cuts:
    1. For L-arm, require det2 > 500 and det1 < 550 (i.e. electron
    is in det2).
    2. For R-arm, require det1 > 500 and det2 < 510 (i.e. electron
    is in det1).

    Here I use a dirty trick: Since there exist pileups (ntrk > 1)
    I still get a peak at the nominal P0 (easily verified by removing
    the cuts). So both peaks are conveniently shown, which illustrates
    the required alignment change of +23 MeV for both HRS, confirming
    the above-mentioned conclusions.


    FIGURE 1

    FIGURE 2