    User name Moffit

    Log entry time 21:16:32 on November28,2005

    Entry number 161203

    keyword=HAPPEX Pedestal runs over.. Detector cables un-installed.

    Detector and scanner cables and switches have been removed from the 
    Spectrometer HUTS.  So detector pedestal runs from now on are worthless.
    
    I guess the data run is offically over.
    
    Great.
    
    Lumi cabling is still installed... and Cavity monitor cabling in still 
    installed.
    
    When the spectrometer arms are moved, the twisted pair cable connecting the 
    ROCS between the arms will be removed.  This means that DAQ will NOT be able to 
    run with BOTH arms... or with the LEFT arm.
    
    The LUMI CODA configuration should work.